Proof testing pile fixity. Once pile is Vibratory Hammer installed, confirmation of the pile reaching full load capacity is achieved by Impact Hammer testing of pile refusal. Information is reviewed by Geotechnical Engineer as required.
Previous
Previous
Discovery Pier Repairs, Cambell River
Next
Next